Sewer Video Inspection Report Form (2025-2026)
2–4 high-resolution stills of the most critical defects found. 6. Sign-off Technician Signature: Confirms accuracy of the field data.
Root intrusion, grease buildup (FOG), debris, or scale. Sewer Video Inspection Report Form
Locations of lateral connections (e.g., "Wye at 15ft") or changes in material. 4. Summary & Recommendations 2–4 high-resolution stills of the most critical defects
General status (e.g., Excellent, Fair, Poor). Action Required: No action needed. Schedule cleaning/hydro-jetting. Spot repair required. Full lining or replacement recommended. grease buildup (FOG)
Unique identifier for the inspection. Date & Time: When the inspection took place. Property Address: Full location of the service. Customer/Client Name: Contact person or entity.
(e.g., PVC, Clay, Cast Iron, Concrete, Orangeburg). Pipe Diameter: (e.g., 4", 6", 8"). Pipe Length: Total distance surveyed. Direction of Survey: (e.g., With Flow / Against Flow).