Arizona Sonoran Copper Aims To Restart Cactus Mine May 2026
According to the October 2025 Pre-Feasibility Study (PFS), the Cactus Project is envisioned as a long-life, low-cost operation with the following key highlights:
Located on privately held land, the project bypasses federal nexus, allowing for a more streamlined, state-led permitting process. Arizona Sonoran Copper aims to restart Cactus mine
The project benefits from its status as a former producing mine, with existing onsite water access, nearby highways, and rail lines. According to the October 2025 Pre-Feasibility Study (PFS),